872 Mount Eden Road
Three Kings, Auckland · Land development
One older house on one title became eleven new dwellings on eleven freehold titles, with the access lot and the shared open space held between the eleven owners.
We were the surveyors for all of it. The control, the boundaries and the levels stayed consistent from the first survey to the last certificate, because the same people set them and signed them off.
- Topographic surveyThe base the design was drawn on
- Scheme planLots, easements and access, through resource consent
- Boundary markoutSet out on the ground as the build started
- Height and sitingCertified as the buildings went up
- As-built drawingsFor the engineering sign-offs
- Section 223Survey plan approved by LINZ
- Section 224(c)Conditions signed off, titles issued

After: the completed development

Before: the site as we found it
More GeoSurvey projects

City Rail Link
Property survey delivery for City Rail Link Ltd: defining the land the tunnels and stations now occupy.

Papakura to Drury
Survey support, drone flights and real-time deflection monitoring of a retaining wall on the southern motorway upgrade.

Seascape
Laser scanning and 3D modelling of the Seascape tower as it went up.

Stratford Solar Farm
Survey for the grid connection of a solar farm and battery storage project in Taranaki.

HP SitePrint, first NZ deployment
One of the first HP SitePrint robotic layout jobs completed in New Zealand.
Project notes
City Rail Link
AucklandProperty surveyWith the railway built, the land it sits in has to be defined properly: the strata the tunnels pass through beneath private property, the protection areas around them, and the road and easement changes the stations brought with them.
Michael leads property survey delivery for City Rail Link Ltd. The work runs zone by zone along the route: surveying the land requirements, preparing the plans behind road stopping and easement applications, and working them through with Auckland Transport, KiwiRail and the utility owners.
It is cadastral surveying at its most exacting. Three-dimensional boundaries under a working city, where every line has to agree with both the as-built tunnel and the title system. Five years earlier Michael ran the construction survey team on the same railway.
Papakura to Drury
South AucklandReal-time monitoringLive motorway, staged construction, and a programme that does not wait. We provide survey support and drone capture on the works for the main contractor.
Alongside it we run a real-time deflection monitoring system on a retaining wall: an automated total station observing prisms continuously, trigger levels agreed with the project team, and alerts that go straight to their phones.
Seascape
Auckland CBDLaser scanningHigh-specification laser scanners set up on the structure as it rose, capturing the as-built tower for 3D modelling. At that height the real constraints are access, wind, and a working site above and below you.
We worked as part of the survey team for the main contractor, bringing the scanning and modelling capability the scope called for.
Stratford Solar Farm
TaranakiRenewablesA solar farm, a battery storage site, and the transmission line that connects them to the grid. We are surveying the corridor for the engineers: road intersections captured above and below ground, and the existing poles and pylons around the substation modelled in 3D.
Taranaki is a long way from Takapuna. We go where the work is.
HP SitePrint, first NZ deployment
AucklandRoboticsA non-square building on a polished concrete slab, where a wrongly placed mark could not be removed. The robot marked the entire layout, and we beat the rain.
The experience behind the practice
Michael Cutfield's work before GeoSurvey went full time in 2023. These were delivered in his roles with the organisations named, not by GeoSurvey.
City Rail Link, C3 contract
2019 to 2021National Survey Manager · DownerThe largest contract on the City Rail Link: stations and twin tunnels under the middle of Auckland. Michael ran a team of twenty surveyors on it. Precision in the confined corridors of the CBD, and guiding the tunnel boring machine beneath them.
Puhoi to Warkworth
2016 to 2019Survey Manager · Northern Express Group, Fletcher Construction and AccionaAn 18 km motorway delivered as a public private partnership: seven million cubic metres of cut, five and a half million of fill, and two structural steel viaducts. The survey problem was keeping machine guidance right across the fleet, and tracking volumes with drones.
Waterview Connection
2013 to 2016Survey Manager · Wellconnected Alliance, Fletcher ConstructionA $1.4 billion motorway tunnel, at the time the biggest roading project in the country. Michael managed up to thirteen surveyors on the surface works around Alice, the tunnel boring machine: real-time monitoring, laser scanning, aerial survey, and the setout and as-builts of the major structures.
Victoria Park Tunnel
2010 to 2011Surveyor · Victoria Park Alliance, Fletcher ConstructionSetout, as-builts and monitoring of the southern approach structures, and the Jacobs Ladder footbridge at the north portal.
Before that: the East London Line and survey work across the City of London, the Tauranga Harbour Link, and the Christchurch infrastructure rebuild. Then two years as General Manager of Survey Worx, New Zealand's largest employer of surveyors, before going full time with GeoSurvey in 2023.

City Rail Link construction, December 2020

Alice, the tunnel boring machine, at breakthrough